PROJECT MATERIALS

 

View presentations, consultation materials, staff reports and other project related materials.

 

Phase 1

Public Meeting Summaries

 

Concise summary reports have been prepared to provide a snapshot of the feedback collected during each public meeting:

 

 

 

Final Terms of Reference

 

Download PDF

Draft Terms of Reference

 

The Draft Terms of Reference outlines the project's phases and timing. Feedback was collected on the draft document during Phase 1 and will be finalized based on comments received before the beginning of Phase 2.

 

Download PDF

Final Public Consultation Plan

 

Download PDF

Draft Public Consultation Plan

 

The Draft Public Consultation Plan describes how stakeholders and the public will be consulted throughout the project. Feedback was collected on the draft document during Phase 1 and will be finalized based on comments received before the beginning of Phase 2.

 

Download PDF

Final Evaluation Criteria

 

Download PDF

Draft Evaluation Criteria

 

Feedback on the Draft Evaluation Criteria was collected on the draft document during Phase 1 and will be finalized based on comments received before the beginning of Phase 2. The Evaluation Criteria will be used throughout the remaining phases of the project to compare corridors, station locations and alignments.

 

Download PDF

Potential Corridors

 

Feedback on potential corridors was collected during Phase 1. The corridors will be updated and finalized based on feedback received before the beginning of Phase 2. All potential corridors will then be evaluated in order to identify the preferred corridor.

 

Download PDF

Phase 1 Public Consultation Report

 

Download PDF

Phase 2 Public Meeting Presentation

Phase 2 Public Meeting Presentation

Public Meeting Summaries

 

Concise summary reports have been prepared to provide a snapshot of the feedback collected during each public meeting:

 

 

 

June 2015 Public Consultation Report

 

Download PDF

February - March, 2016 Public Meeting Presentation

Public Meeting Summaries

 

Concise summary reports have been prepared to provide a snapshot of the feedback collected during each public meeting:

 

 

 

February/March, 2016 Public Consultation Report

 

 

April 23, 2016 Scarborough Transit Town Hall Update Presentation

© 2015 Line 2 Subway Scarborough, City of Toronto and Toronto Transit Commission

Privacy / Accessibility

 

Site by AECOM